Replace Piece Of T111 Siding
If the damaged area is at the bottom flush the bottom edge of the new piece with the bottom.
Replace piece of t111 siding. Mark the cut lines of the new siding to ensure a straight cut using a large t square or. Typical installation aligns the bottom edge of the first row of siding 2 to 4 inches below the wall s bottom sill plate and over a continuous layer of waterproof kraft paper or polyethylene plastic sheeting. Complete the installation of the first horizontal row of t1 11 siding following standard construction practices. T1 11 including rb b is a pattern of construction with evenly when applied on wall grooves on it available in 11 32 19 32 and 3 4 thicknesses in varying areas with several different groove widths and spacings 1 2 1 and 1 1 2 groove width either square bottom or micro grooved and with groove spacings of 4 8 12 and 16 inches.
I ended up doing the length up to the trim and cut and replaced the 1 2 piece behind the trim. Transfer the measurements to a new piece. Replacing the t 111 siding on your house is a major project that is best broken down into sections. If you have t 111 siding on your home you may be having some of the same issues which are presented in this video.
Carefully examine your t1 11 siding for signs of mold wood rot or beyond minor water damage. I offer you some tips on how to make an in. My length was about 21 feet the depth i chose was the depth of the trim 3 4 plus the depth of my t1 11 siding 1 2 for a total of 1 1 4. Center the piece of t 111 over the damaged area with equal proportions of overhang all the way around.
Houses with t 111 rarely have sheathing under the siding and when you remove the t 111 the studs and wall insulation will be exposed.