Rigid Foam Under Roof Sheathing
Apply continuous air control membrane to existing roof sheathing or implement continuous air control at roof sheathing.
Rigid foam under roof sheathing. More effective insulation with r values ranging from 3 6 to 8 0 rigid foam sheathing has much better insulation per inch than other materials i e. Rigid insulation is one of the best tools to reduce your energy costs. The illustration shows two layers of osb or plywood roof sheathing. The way this is installed would be the osb to the exterior.
Install rigid insulation board in multiple layers with joints offset vertically and horizontally between adjacent layers. Open or closed cell spray foam is applied to the underside of the roof sheathing and additional fiberglass or cellulose insulation is blown in as a cost saving method for meeting high insulation requirements and filling in the cavity space between the rafters to the ceiling deck. 4 of polyiso under 4 of eps all above the original roof sheathing. Start at the bottom of the roof and place the first piece of rigid foam insulation against the metal flashing starting at the center line.
In my local area there is a green building consultant that recommends a ci panel which is basically eps foam glued to osb. Installed on the roof exterior foam makes the living space below more comfortable and reduces the likelihood of ice dams. Almost every house i see with exterior rigid foam in my online wonderings is covered with blue and pink xps the osb sheathing is nailed directly to the studs and is completely covered with the rigid foam. Plywood has an r value of 1 25 and fiberglass batts have an r value of 3 14.
They keep your home at a comfortable temperature without the need to crank your heat. Nail it around the edges with roofing nails. A lower layer conventionally nailed to the rafters and an upper layer installed as a nailing surface for the roofing material on top of the rigid foam. Rigid foam insulation also known as insulating boards provide high r values.
Then a second layer of plywood sheathing and asphalt shingles following the steps explained in this article. In warm climates zones 1 through 4 low density open cell spray foam insulation is the typical choice since it is vapor permeable and will allow drying of the exterior sheathing and roof framing if they happen to get wet via diffusion into the interior of the building. You can even place it under the foundation slab. Install it anywhere from the roof to the foundation.